01
Catch
Wind farms overproduce on storm fronts. Our halls sit at the substation and absorb the surplus at the moment it is cheapest, often when the price goes negative.
4 hduration at full output
Wind farms overproduce on storm fronts. Our halls sit at the substation and absorb the surplus at the moment it is cheapest, often when the price goes negative.
Lithium-iron-phosphate racks in fire-sealed, nitrogen-flooded halls. No cobalt, no thermal runaway path between modules, a round trip that loses less than a tenth.
At the evening peak the fleet dispatches on a signal from our own desk, bid into the day-ahead and balancing markets, and covers the gap until the night wind returns.
| Site | Capacity | Interconnection | Status |
|---|---|---|---|
| Harrow Flats | 640 MWh | 132 kV, Harrow substation | Online 2024 |
| Saltmarsh | 800 MWh | 275 kV, coastal ring | Online 2025 |
| Kestrel Ridge | 1.2 GWh | 400 kV, ridge interconnector | Commissioning 2026 |
| Anvil North | 2.0 GWh | 400 kV, new bay | Planned 2027 |
Send us the single-line diagram and the last twelve months of nodal prices. We reply within a week with a hall size, a duration and a revenue floor.